Construction Photos
Cut in the wall for a door into the Control Room (left and below)
Cut in the wall for a window from the Control Room (left and below)
Cut in the wall for a new door into Utility Room (left)
Control Room: Door and window cuts with new frames (right)
New MTS Actuators (left)
New Pacific DAQ and MTS FlexTest Controller (right)
New MTS Service Manifolds (left)
New Hydraulic Pipes (right)
Trenches for cables (North left, South below)
Trenches for cables south side (left and below)
Trenches for cables south side finished (left and below)